Follow Main Street Monroe: Facebook Google+ Twitter

 
  New Posts New Posts RSS Feed - APPROVED South Union Road Project
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

APPROVED South Union Road Project

 Post Reply Post Reply
Author
 Rating: Topic Rating: 1 Votes, Average 4.00  Topic Search Topic Search  Topic Options Topic Options
Monroe News View Drop Down
Prominent Voice Citizen
Prominent Voice Citizen


Joined: Oct 12 2010
Status: Offline
Points: 4411
Post Options Post Options   Thanks (0) Thanks(0)   Quote Monroe News Quote  Post ReplyReply Direct Link To This Post Topic: APPROVED South Union Road Project
    Posted: Mar 10 2018 at 3:02pm
Resolution No. 16-2018. A Resolution authorizing the City Manager to accept a proposal from 
Jones-Warner Consultants, Inc. for professional survey and design services related to the South 
Union Road Improvement Project.

Background. This is a proposal for the survey and design for the widening and improvement of South 
Union Road from Nickel Road to just north of Navigator Way, approximately 1,850’ in length.  This 
portion of S. Union Road is in very poor condition and in need of rehabilitation as well as 
widening.   The improvements will include total reconstruction of this portion of South Union Road, 
widening to achieve two (2) 12’ lanes, curb and gutter and a detailed street lighting plan to match 
the design criteria established in the Park North Industrial Park.  The project also included the 
installation of a new culvert over Swamp Run as well as any storm permitting an
design required for the project.  This project was included in this year's streets operating 
budget.



Source: Monroe Council Agenda
Regular Meeting of Council
March 13, 2018 – 6:30 p.m.
233 South Main Street, Monroe, Ohio
Monroe, Ohio Breaking News
Back to Top
Monroe News View Drop Down
Prominent Voice Citizen
Prominent Voice Citizen


Joined: Oct 12 2010
Status: Offline
Points: 4411
Post Options Post Options   Thanks (0) Thanks(0)   Quote Monroe News Quote  Post ReplyReply Direct Link To This Post Posted: Mar 10 2018 at 3:05pm
1,850’ in length.   The scope will include a topographical survey, total reconstruction of this 
portion of South Union Road, widening to achieve at minimum, two (2) 12’ lanes, curb and gutter and a detailed
street lighting plan to match the design criteria established in the Gateway Park.



Source: Monroe Council Packet
Regular Meeting of Council
March 13, 2018 – 6:30 p.m.
233 South Main Street, Monroe, Ohio
Monroe, Ohio Breaking News
Back to Top
Monroe News View Drop Down
Prominent Voice Citizen
Prominent Voice Citizen


Joined: Oct 12 2010
Status: Offline
Points: 4411
Post Options Post Options   Thanks (0) Thanks(0)   Quote Monroe News Quote  Post ReplyReply Direct Link To This Post Posted: Mar 26 2018 at 3:49pm

Resolution No. 16-2018. A Resolution authorizing the City Manager to accept a proposal from 
Jones-Warner Consultants, Inc. for professional survey and design services related to the South 
Union Road Improvement Project.

Mr. Brock stated that this is for the portion of Union Road between Navigator Way and Nickel Road.

Mr. Clark moved to consider this the first reading of Resolution No. 16-2018 and have it read by 
title only; seconded by Mr. Hickman.  Voice vote.  Motion carried.

The Clerk of Council read Resolution No. 16-2018 by title only.

Mr.  Clark  moved  to  approve  the  first  reading  of  Resolution  No.  16-2018;  seconded  by  
Mrs.
McElfresh.  Roll call vote:  seven ayes.  Motion carried.

Monroe, Ohio Breaking News
Back to Top
Monroe News View Drop Down
Prominent Voice Citizen
Prominent Voice Citizen


Joined: Oct 12 2010
Status: Offline
Points: 4411
Post Options Post Options   Thanks (0) Thanks(0)   Quote Monroe News Quote  Post ReplyReply Direct Link To This Post Posted: Apr 13 2018 at 10:37am
Resolution No. 16-2018. A Resolution authorizing the City Manager to accept a proposal from
Jones-Warner Consultants, Inc. for professional survey and design services related to the South
Union Road Improvement Project. (Second Reading)

Mrs. Waggaman stated this is to accept a proposal for survey and design services related to the
South Union Road Improvement Project.

Mr. Clark moved to consider this the second reading of Resolution No. 16-2018 and have it read
by title only; seconded by Mrs. Hale. Voice vote. Motion carried.

The Clerk of Council read Resolution No. 16-2018 by title only.
Mr. Clark moved to adopt Resolution No. 16-2018; seconded by Mr. Funk. Voice vote. Motion
carried.

Source: Monroe Council Minutes
Regular Meeting of Council
March 27, 2018 – 6:30 p.m.
233 South Main Street, Monroe, Ohio
Monroe, Ohio Breaking News
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

The Voice | Weather | Advertisers | Advertising Information | Lending Library | Monroe Church Directory

Archived Monroe News From: 1999 | 2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011

Website Design © Xponex Web and Media Services | Contact | Terms of Use | Copyright ©2012 MainStreetMonroe.com